A Computerized System for Managing Con-struction Materials for Gaza Strip Building Contractors( Vol-3,Issue-7,July 2017 )
MLA | Dr. Eyad Haddad et al ."A Computerized System for Managing Con-struction Materials for Gaza Strip Building Contractors". International Journal of Advanced Engineering, Management and Science(ISSN: 2454-1311),vol 3, no. 7, 2017, pp.785-795 Infogain Publication, doi:10.24001/ijaems.3.7.11 |
APA | Dr. Eyad Haddad(2017).A Computerized System for Managing Con-struction Materials for Gaza Strip Building Contractors. International Journal of Advanced Engineering, Management and Science(ISSN: 2454-1311),3(7), 785-795. http://dx.doi.org/10.24001/ijaems.3.7.11 |
Chicago | Dr. Eyad Haddad. 2017,"A Computerized System for Managing Con-struction Materials for Gaza Strip Building Contractors". International Journal of Advanced Engineering, Management and Science(ISSN: 2454-1311).3(7):785-795. Doi: 10.24001/ijaems.3.7.11 |
Harvard | Dr. Eyad Haddad. 2017,A Computerized System for Managing Con-struction Materials for Gaza Strip Building Contractors, International Journal of Advanced Engineering, Management and Science(ISSN: 2454-1311).3(7), pp:785-795 |
IEEE | Dr. Eyad Haddad."A Computerized System for Managing Con-struction Materials for Gaza Strip Building Contractors", International Journal of Advanced Engineering, Management and Science(ISSN: 2454-1311),vol.3,no. 7, pp.785-795,2017. |
Bibtex |
@article {dr.eyadhaddad2017a, title={A Computerized System for Managing Con-struction Materials for Gaza Strip Building Contractors}, author={Dr. Eyad Haddad}, journal={International Journal of Advanced Engineering, Management and Science}, volume={3}, year= {2017}, } |