ijaers social
facebook
twitter
Blogger
google plus

International Journal of Advanced Engineering, Management and Science

Why PPP Modeled Infrastructure Projects Failed:A Critical Review with a Special Focus on Road Sector
( Vol-3,Issue-4,April 2017 )


MLA N. Srinivasa Reddy et al ."Why PPP Modeled Infrastructure Projects Failed:A Critical Review with a Special Focus on Road Sector". International Journal of Advanced Engineering, Management and Science(ISSN: 2454-1311),vol 3, no. 4, 2017, pp.331-338 Infogain Publication, doi:10.24001/ijaems.3.4.8
APA N. Srinivasa Reddy, Pankaj Sharma(2017).Why PPP Modeled Infrastructure Projects Failed:A Critical Review with a Special Focus on Road Sector. International Journal of Advanced Engineering, Management and Science(ISSN: 2454-1311),3(4), 331-338. http://dx.doi.org/10.24001/ijaems.3.4.8
Chicago N. Srinivasa Reddy, Pankaj Sharma. 2017,"Why PPP Modeled Infrastructure Projects Failed:A Critical Review with a Special Focus on Road Sector". International Journal of Advanced Engineering, Management and Science(ISSN: 2454-1311).3(4):331-338. Doi: 10.24001/ijaems.3.4.8
Harvard N. Srinivasa Reddy, Pankaj Sharma. 2017,Why PPP Modeled Infrastructure Projects Failed:A Critical Review with a Special Focus on Road Sector, International Journal of Advanced Engineering, Management and Science(ISSN: 2454-1311).3(4), pp:331-338
IEEE N. Srinivasa Reddy, Pankaj Sharma."Why PPP Modeled Infrastructure Projects Failed:A Critical Review with a Special Focus on Road Sector", International Journal of Advanced Engineering, Management and Science(ISSN: 2454-1311),vol.3,no. 4, pp.331-338,2017.
Bibtex @article {n.srinivasareddy2017why,
title={Why PPP Modeled Infrastructure Projects Failed:A Critical Review with a Special Focus on Road Sector},
author={N. Srinivasa Reddy, Pankaj Sharma},
journal={International Journal of Advanced Engineering, Management and Science},
volume={3},
year= {2017},
}